106 acresGarbani Road at Interstate 215

Where Menifee grows next.

A master-planned mixed-use district on a hill above a creek, in one of the fastest-growing cities in Southern California's Inland Empire.

01 — The land today

Before anything, the ground.

Open land on both sides of Haun Road, running south from Garbani Road, with the 215 Freeway along the eastern edge and the hill rising to the west.

Site
106 acres
Frontage
Haun Rd · Garbani Rd · 215

02 — Open space

Nature first, as infrastructure.

A hillside park on the western edge, greens threaded between the blocks along the natural drainage, and room for a future park to the south.

Public realm
Hillside park · greens · trails

03 — Streets and blocks

Twenty-one blocks. Short walks.

A connected grid of tree-lined streets. Parking sits in structures in the middle of blocks, so the streets are lined with front doors and shopfronts instead of parking lots.

Blocks
21
Parking
Mid-block structures

04 — The district

Then, a neighborhood.

Apartments and townhomes, shops and restaurants around a town square, offices and a hotel by the freeway, and civic buildings at the center.

Homes
2,526
Commercial
≈1.02M sq ft

The cityMenifee, Riverside County

A young city that is still deciding where its center is.

Incorporated in 2008, Menifee is one of the youngest and fastest-growing cities in Riverside County. 125,547 people live here, the median age is under 35, and the city sits at a regional crossroads between Temecula and Riverside.

Haun Road, its main commercial spine, carries more than 50,000 vehicles a day. What Menifee does not yet have is a true mixed-use place: somewhere to walk, eat, meet and stay. Hilltop District is planned to be that place.

125,547Residents
Under 35Median age
2008Year incorporated
50K+Vehicles a day on Haun Road
100K+Vehicles a day on I-215

Hilltop District.

106 acres. Menifee's community core.

Where the Inland Empire builds next.

Conceptual illustration
A shaded plaster arcade with an olive tree, the kind of public room the district is designed around
Conceptual illustration

The vision

More than real estate. A community cornerstone.

Hilltop District was designed from the ground up to be the place Menifee has always needed and never had: a destination where residents shop, dine, work, live and connect, all within walking distance of each other.

It is not a strip mall and it is not speculative infill. It is one cohesive plan, built in phases that each stand on their own and add value to the next.

Menifee has the fastest-growing population in Riverside County. Hilltop District gives it somewhere to arrive.

Legacy Asset Developers
  1. 01

    Lifestyle retail and entertainment

    Experiential anchors in place of big boxes.

  2. 02

    Restaurants, food hall and market

    A main street built around eating together.

  3. 03

    Office and medical office

    Daytime jobs that keep the district busy at noon.

  4. 04

    Boutique hotel and hospitality

    A reason to stay the night at the freeway gateway.

  5. 05

    Homes for sale and for rent

    Apartments, townhouses, row houses and flats.

  6. 06

    Civic green space

    A town square, a hillside park, and the creek.

A festival in the town square: a band on stage, a crowd on the lawn, lanterns in the oaks and market stalls around the edge
Conceptual illustration

The town squareThe heart of the district

Where Menifee comes together.

Every town needs one place where everyone ends up. At Hilltop it is the square: a lawn and plaza with a permanent stage, built for festivals, concerts, holiday celebrations and weekend markets.

Shops, cafes and restaurants open straight onto it, so the square is busy on an ordinary Tuesday and full on a festival night.

  • Festivals and celebrationsSeasonal and cultural events through the year
  • A stage for musicConcerts, singers, school and community performances
  • Markets and gatheringsFarmers markets, craft fairs, movie nights
  • Retail and dining all aroundShopfronts and terraces facing the square

PlacesSix rooms in one district

Keep scrolling

A tree-shaded main street with restaurants at street level and homes above
01

Market Street

Apartments over shopfronts, wide brick sidewalks, and a canopy of sycamore and oak.

A timber-roofed food hall with long shared tables
02

The Market Hall

Open kitchens, long tables, doors that slide away to the patio.

A restored creek with a trail, a footbridge and a restaurant terrace beside it
03

The Creek

Restored habitat with a trail and footbridges, and dinner on a terrace beside the water.

A town square at dusk with a small concert under oak trees
04

The Square

A lawn under the oaks for markets, concerts and ordinary Tuesday evenings.

A boutique hotel with an arched loggia and a rooftop terrace at blue hour
05

The Gateway

A boutique hotel and rooftop at the freeway edge, visible from Interstate 215.

Townhomes with porches and gardens along a pedestrian paseo
06

The Neighborhoods

Townhomes, row houses and courtyard flats on green paseos that lead to the hill.

All images are conceptual illustrations of design intent. Architecture, landscape and uses will be defined by the Specific Plan.

LocationSouthwest Riverside County

At the intersection of everything.

≈10 min≈15 min≈20 min I-215 I-15 Garbani Rd March Air Reserve Base Perris Lake Elsinore Murrieta Temecula Hilltop District ↖ Los Angeles ≈75 min ↖ Ontario Intl. ≈45 min San Diego ≈60 min ↘ N

Schematic, not to scale. Drive times are approximate.

The site sits beside the Garbani Road interchange on Interstate 215 and straddles Haun Road. More than 100,000 vehicles pass within sight of it every day.

  • Interstate 215

    Direct frontage and freeway visibility along the full eastern edge.

  • Garbani Road

    A planned interchange at the district's front door.

  • Haun Road corridor

    Menifee's busiest commercial street runs through the middle of the plan.

Drive times
Murrieta≈10 min
Lake Elsinore and Wildomar≈12 min
Temecula wine country and Old Town≈15 min
Perris and Moreno Valley≈15 min
March Air Reserve Base≈20 min
Ontario International Airport≈45 min
San Diego International Airport≈60 min
Downtown Los Angeles≈75 min

Master planPreferred plan

The preferred master plan.

Not an approved plan. The project is in design and planning; footprints and uses follow the preferred master plan, building heights are illustrative, and everything is subject to change and to City of Menifee approval.

Aerial concept view of the district

BuildingsCharacter studies in 3D

What gets built on those blocks.

Drag to turn Study models of architectural character. Not final designs.

Foundational principlesHow the district decides

Ten principles to test every idea against.

Form and character

  1. 1
    Build an active, mixed-use district

    A neighborhood as well as a destination.

  2. 2
    Create the public realm as civic infrastructure

    Plan for shared spaces at a variety of scales.

  3. 3
    Design for walking and connected living

    Get around within Hilltop without a car.

  4. 4
    Integrate nature into daily life

    Respect and enhance existing assets.

  5. 5
    Foster a diverse, intergenerational community

    Support a variety of ages, incomes and life stages.

Framework and process

  1. 6
    Establish a framework for incremental growth

    A plan that allows flexibility and adaptation over time.

  2. 7
    Invest in the quality of place

    Maintain shared places with care.

  3. 8
    Support local identity and civic life

    Make Hilltop a part of Menifee's identity.

  4. 9
    Embrace the City's vision of the Haun corridor

    Help define what the corridor becomes.

  5. 10
    Create a legacy in Menifee

    Cultivate and capture value over time.

The pathEntitlement to opening day

Identity first. Volume later.

Phase 1 · Years 1 to 3

Foundation and identity

The creek corridor, the first homes, and a compact core of food, coffee and daily needs. Enough to make it a place before it is a big one.

Phase 2 · Years 3 to 5

Mixed-use intensification

Main street fills in. Entertainment, more dining, workplaces and additional housing follow the foot traffic the first phase creates.

Phase 3 · Year 5 onward

Urbanization and completion

Hospitality, the freeway gateway and the remaining blocks complete the district.

  1. 01

    Acquisition and pre-application

    Site assembled and pre-application review with the City of Menifee Planning Department.

    Complete
  2. 02

    Framework plan and community engagement

    Design charrette, framework scenarios and stakeholder outreach.

  3. 03

    Specific Plan and environmental review

    Specific Plan, General Plan Amendment, rezone and Environmental Impact Report. An estimated 24 to 30 month process.

  4. 04

    Mapping and infrastructure

    Tentative tract map, grading, utilities and road improvements.

  5. 05

    Phase 1 construction and opening

    Vertical construction, first tenants and first residents.

Disclaimer

These plans are not approved. The project is in design and planning.

The master plan, renderings, 3D models, acreages, unit counts and square footages on this site describe a proposal that is still being designed. They have not been approved by the City of Menifee or any other agency, and they will change as design, environmental review and the entitlement process continue. Nothing shown here is a commitment to build, and images are conceptual illustrations, not depictions of final buildings.

InvestLegacy Asset Developers

This is Menifee's moment.

Real estate value is created through entitlement. Hilltop District offers qualified investors a way to take part at that stage: before vertical construction, before stabilization, and before institutional buyers re-price the asset.

  • Entitlement-driven value creation
  • 106 acres in an undersupplied market
  • Freeway-visible and freeway-accessible on I-215
  • A phased structure that deploys capital in steps
  • Regulation D, Rule 506(c). Accredited investors only

Request the investment deck

Requests go to invest@hilltopdistrict.com. Or write to invest@hilltopdistrict.com

Request the investment deck